ICP International Comfort Products 1178677 Temperature Switch, Defrost Sensor, 50-1/2 Inch Long Leads

(No reviews yet) Write a Review

$59.45

11 In Stock, Orders Placed By 3pm EST Ship Same Day (Weekends And Holidays Excluded)

Free ground shipping to the lower 48 states

Product ID:
V03-ICP-1178677
Weight:
2.00 (Lbs.)
Ships By:
Free Ground, Or Choose Expedited Shipping At Checkout
Ships From:
Illinois - Direct From Supplier
Adding to cart… The item has been added

ICP International Comfort Products 1178677 Features:
- Temperature Switch Temperature Switch ensures safety by identifying and alerting potential hazards within the environment.
- Real OEM buttons and switches support efficient HVAC operation for ideal indoor climate control.
- Defrost Sensor.
- 50-1/2 Inch Long Leads.

Fits These ICP Models:
- PDD324040K000C1.
- PDD324040K001C1.
- PDD324060K000C1.
- PDD324060K001C1.
- PDD330040H000C1.
- PDD330040H001C1.
- PDD330040K000C1.
- PDD330040K001C1.
- PDD330060H000C1.
- PDD330060H001C1.

Why use genuine ICP OEM parts:
- Ease of installation - exact drop-in replacement
- Guaranteed reliability and exceptional factory support
- Safe system operation
- Retain published system efficiencies, ratings and certifications
- Preserve critical sound level and sound quality requirements
- Re-establish unit’s original performance