ICP International Comfort Products 1173637 Defrost Sensor, Temperature Switch, 50-1/2 Inch Long Leads

(No reviews yet) Write a Review

$79.09

433 In Stock, Orders Placed By 3pm EST Ship Same Day (Weekends And Holidays Excluded)

Free ground shipping to the lower 48 states

Product ID:
V03-ICP-1173637
Weight:
10.00 (Lbs.)
Ships By:
Free Ground, Or Choose Expedited Shipping At Checkout
Ships From:
Illinois - Direct From Supplier
Adding to cart… The item has been added

ICP International Comfort Products 1173637 Defrost Sensor Features:
- Defrost Sensor.
- Temperature Switch.
- 50-1/2 Inch Long Leads.
- L65-33F.

Additional Features
The International Comfort Products 1173637 Temperature Switch aids in the detection of system inefficiencies, allowing for timely interventions and improvements.

Fits These ICP Models:
- C2H318GKA100.
- C2H318GKA200.
- C2H318GKD100.
- C2H318GKD200.
- C2H324GKA100.
- C2H324GKA200.
- C2H324GKD100.
- C2H324GKD200.
- C2H330GKA100.
- C2H330GKA200.

Why use genuine ICP OEM parts:
- Ease of installation - exact drop-in replacement
- Guaranteed reliability and exceptional factory support
- Safe system operation
- Retain published system efficiencies, ratings and certifications
- Preserve critical sound level and sound quality requirements
- Re-establish unit’s original performance